Brandon Productions

Blog

I've decided to greatly upgrade the acoustics in my control room.  After careful consultation, meetings at NAMM, and deliberation, I've worked with GIK Acoustics on the design and have locked in an order.   By mid March, the control room will be MUCH better from an acoustics standpoint.   The room has always been treated, but now I'm taking a big leap in getting it to sound as true as possible.  These guys at GIK have been great.  Their design advice is fantastic and being able to meet the owner at NAMM and check out their products makes a big difference.